All articles
Planning
·
·
6 min read
Do I need planning permission for a rear extension?
Permitted development, prior approval, conservation areas and listed buildings: what applies to your house, in plain English.

Ruth Mortise
Director & project manager

Many single-storey rear extensions can be built under permitted development, without a full planning application. But the rules change in a conservation area, and they don’t apply at all to listed buildings or flats.
As a rough guide, a detached house can extend up to 4 metres at the back and a terraced or semi-detached house up to 3 metres, no higher than 4 metres. Larger extensions can still go ahead through the prior approval scheme, where neighbours are asked for comments.
In Lewes, much of the town is a conservation area, so side extensions and changes to the front almost always need permission. We always check the planning history of the house before we draw anything.
Whatever the planning route, you will still need building control approval, and often a party wall agreement. We handle all three as part of the job.
N° 01 — Keep reading
More from the yard.

Materials
·
5 min read
Lime plaster or gypsum: which does an old house need?
Why solid-walled houses need to breathe, and when modern plaster is fine.

Costs
·
7 min read
What a fair builder's quote looks like
Line items, provisional sums, contingency and payment stages: how to compare quotes without getting caught out.

Restoration
·
4 min read
Repair, don't replace: saving sash windows
Most rotten sashes can be repaired for a fraction of the cost of new, and draught-proofed to perform almost as well.
Start with a survey
Tell us about your house.
A free survey visit, a clear written quote within ten working days, and no pressure.
